Serving Lincoln County for more than a century!

Notice of Joint Local-State Public Comment Period, SEPA Environmental Review, and Public Hearing

Notice of Joint Local-State

Public Comment Period,

SEPA Environmental Review,

and Public Hearing:

Lincoln County Coalition

Shoreline Master Program -

2023 Periodic Review

NOTICE IS HEREBY GIVEN

that the Lincoln County Coalition

Shoreline Master Program and

Washington State Department

of Ecology (Ecology) are seeking

comments on the Coalition’s

Shoreline Master Program

(SMP) periodic review and proposed

SMP Amendments. The

joint 30-day local/state public

comment period will run from

March 23rd 2023, through April

24th, 2023, at 5:00 p.m.

Authority for the periodic review

is based on Washington’s

Shoreline Management Act (Ch.

90.58 RCW) and related rules.

These amendments were led by

Lincoln County as a coalition of

County government and participating

city and towns with designated

shorelines of the state.

The participating communities

include: Lincoln County; Reardan

and Odessa. This periodic

update is in order to comply

with WAC 173-26-090, which

requires all local governments to

review their SMPs on an eightyear

schedule set in state law

and revise it if necessary. The

review ensures the SMP keeps

up with changes in state law,

changes in other County, City

and Town plans and regulations,

and other changed circumstances.

The Coalition has elected

to use the optional joint review

process to combine the local

and Ecology comment periods,

as allowed under WAC 173-26-

104. No additional comment

period will occur during the state

review process. Comments

provided to the County will be

reviewed by both the Coalition

and Ecology. There is no need

to send comments directly to

Ecology.

Comments may be submitted

to County Planner, Courtney

Thompson, at planning@co.lincoln.

wa.us or mailed to Lincoln

County Planning Division, Lincoln

County Land Services,

27234 State Route 25 N, Davenport,

WA 99122. Comments

may also be at the public hearing

noted below.

At the conclusion of the comment

period, the Coalition will

prepare a response to comments

and determine whether

changes are needed. Public

comments and County responses

will be shared with Ecology.

After local adoption, the SMP

amendment will be formally

submitted to Ecology for final

action per WAC 173-26-104 and

WAC 173-26-110. Ecology will

review amendments for consistency

with state laws and rules.

Ecology may either approve

the program as adopted or may

recommend changes.

SEPA Threshold Determination

Lincoln County has determined

that this proposal does not have

a probable significant adverse

impact on the environment. An

environmental impact statement

is not required under the State

Environmental Policy Act, RCW

43.21C.030(2)(c). This determination

of nonsignificance

(DNS) was made after review

of a completed environmental

checklist and other information

on file with the lead agency and

can be found here:

https://www.co.lincoln.wa.us/

land-services/2021-2023-smpupdate/

This determination is issued pursuant

to WAC 197-11-340(2).

Lincoln County will not act on

this proposal for 14 calendar

days from the date of issuance.

The SEPA comment and appeal

period runs from March 23rd,

2023 to April 6th, 2023.

Documents related to this proposal

are available for review

at: https://www.lincolnsmpopenhouse.

com/

A Public Hearing is to be held

by the Lincoln County Planning

Commission on April 10th, at

10:00 a.m. The meeting location

is at 27234 SR 25 N Davenport,

WA 99122, Lincoln County Public

Works Building, Washington.

If you would like to attend virtually,

You can attend via Zoom

using the following link and/or

phone number:

https://us06web.zoom.us/

j/85015268319?pwd=a2ZLNmRvT3FzRzZQNDJFVHVZWVNjdz09

Meeting ID: 850 1526 8319

Passcode: 180777 Dial:

1-253-215-8782 ID: 850 1526

8319# Passcode: *180777#

DATED THIS 16th DAY OF

MARCH, 2023 – LINCOLN

COUNTY LAND SERVICES

 

Reader Comments(0)